Concept
Lead Time Demand is the demand
expected to occur during the lead time
for the part.
Examples
Suppose our annual demand level
is 1
and lead time
is 365 days
. The Lead Time Demand will be 1
.
Suppose our annual demand level
is 2
and our lead time
is 365 days
. The The Lead Time Demand is 2
.
Suppose our annual demand level
is 5
and our lead time
is 700 days
. The The Lead Time Demand will be 5*700/365
or 9.58
.